SHALLOW OVERBUDEN TUNNEL CONSTRUCTION METHOD

机译:浅埋暗挖隧道施工方法

摘要

The invention superficial tunnel does not allow for surface subsidence in the superficial tunnel crossing the road or rail from the bottom relates to a method, superficial tunneling method according to the present invention, the load for measuring the subsidence of the upper portion of the tunnel, the tunnel construction around the superficial Extended small meter (Rod Extensometer; 11) and the horizontal deformation of the superficial tunnel excavation of the sink Cleveland furnace meter (Inclinimeter; 12) for measuring a step (S1) to install; The furnace of Cleveland meter 12 for excavating the pilot tunnel excavation line and 21 of the central portion of the Temple of the tunnel to the lower position of the center of the left and right pilot tunnel excavation line on both sides of the pilot tunnel (21, 22, and a step (S2) to install the pilot tunnel for the pipe loop (30) in the longitudinal direction of the tunnel in the excavation line 23); Excavating the excavation line of the center and the left and right of the pilot tunnel (21, 22, 23) with ringkeot and install the band-shaped drain boards 35 at the bottom of the inside of the pipe loop (30) is already installed in the excavation line, and the strip-like Each of the excavation line of the drain boards in the lower pre-loading, but jaekking the steel ribs 40 on the inside jack 50 of the unit 35, the steel ribs 40 are the center, left and right of the pilot tunnel (21, 22, 23) laying the left and right sides of the steel ribs 41 to both sides on both sides, the step (S3) and is built by connecting the arched steel ribs 42, the preloading jack 50 via the left and right between the steel ribs 41; Constructed a pillar portion (25, 26, 27) with a base and columns on each of the right and left side walls of the center and left and right pilot tunnel (22, 23) of the pilot tunnel 21 of the center and, of the pillar portion 25 and step (S4) for grouting the upper part of Heaven; But form the main tunnel (28) is supported on both sides of the pillar portion 25 of the left and right pillars (26, 27) of the pilot tunnel (21) of the center, along the excavation line of the main tunnel 28 installed so that the beams prophet pipe loop (31) for the main tunnel in the longitudinal direction, and the pillar portion 25 and the left and right both sides of the central pilot tunnel of the pilot tunnel (21) (22, 23) of the pillar portion (26, 27, steel ribs 40 and the pilot tunnel for the pipe loop (30) in the step (S5) to the inside of the dissolution); The band-shaped installing drain boards 35 at the bottom of the inside of the tunnel for the main pipe loop (31) along the main tunnel excavation 28 in ringkeot and pipe loop for the main tunnel (31), the band-shaped drain boards 35 the lower pre-load the steel ribs 40 on the inner side of the step is characterized in that consisting of (S6) to jaekking with jack 50. ; The present invention thus constituted the road, a method mainly used for the tunnel can not be allowed to wonjiban settlement in terms of the tunnel, the upper part of the state space is limited, such as railways and, all except the ultra soft ground can be applied to the soil, and in particular, the curve can be constructed tunnels, to glass in the air with a special technique of conventional economics than the tunnel, and the shape of the tunnel arch tunnel, two arches, one arch, one does not have a pilot tunnel arch tunnel etc. can be variously constructed for.
机译:本发明的浅埋隧道不允许地面沉降,该浅埋隧道从底部横穿道路或铁路,涉及一种方法,根据本发明的浅埋隧道方法,用于测量隧道上部沉降的载荷,浅表延伸小流量计(Rod引伸计; 11)周围的隧道施工以及水槽克利夫兰炉表(Inclinimeter; 12)的浅表隧道开挖的水平变形,用于安装步骤(S1);克利夫兰仪表12的炉子,用于将引水隧洞开挖线和隧道殿的中心部分21开挖至引水隧洞两侧左右引水隧洞开挖线中心的下部位置(21 ,22,以及步骤(S2),以将管道回路(30)的先导隧道沿开挖管线23的长度方向安装在该隧道的纵向上;在先导管道(21、22、23)的中心和左右方向开挖并用环龙骨开挖并将带状排水板35安装在管环(30)内部的底部在挖掘线和条状中,排水板的每个挖掘线在较低的预加载状态下,但在单元35的内部千斤顶50上刺穿钢肋40时,钢肋40为中心,引导隧道(21、22、23)的左右两侧将钢肋41的左右两侧放置在两侧的两侧,台阶(S3)并通过连接拱形钢肋42进行构建,千斤顶50通过左右的钢肋41之间;构造了一个支柱部分(25、26、27),该支柱部分(25、26、27)在中心的中央通道的左右侧壁和中央引燃通道21的左侧和右侧引燃通道(22、23)的每个侧壁上具有底座和立柱,并且柱部25和用于对天堂的上部进行灌浆的步骤(S4)。但是,主隧道28沿着安装的主隧道28的开挖线被支撑在中央的引水隧道21的左右支柱26、27的支柱部25的两侧。从而使梁在纵向方向上预示用于主隧道的管环(31),以及导引隧道(21)(22、23)的支柱部分25和中央导引隧道的左右两侧。柱部(26、27,钢肋40和在步骤(S5)中向内部的管环(30)的引燃通道);带状安装排水板35沿着环形隧道和主隧道(31)的管环沿主隧道开挖28在用于主管道环路(31)的隧道内部的底部,带状排水板如图35所示,下部的预加载的钢肋40在台阶内侧上的特征在于,其由(S6)与千斤顶50顶起。这样构成的本发明的道路,主要用于隧道的方法就不能在隧道方面进行准时沉降,在国家空间的上部是有限的,例如铁路等,除了超软土地可以适用于土壤,尤其是可以使用弯道建造隧道,使用比隧道传统的特殊经济技术在空中玻璃,隧道的形状拱形隧道,两个拱形,一个拱形,一个没有引水隧道,拱形隧道等。

著录项

  • 公开/公告号KR20060072914A

    专利类型

  • 公开/公告日2006-06-28

    原文格式PDF

  • 申请/专利权人 SEO DONG HYUN;

    申请/专利号KR20040111686

  • 发明设计人 SEO DONG HYUN;

    申请日2004-12-24

  • 分类号E21D9/00;E21D9/04;

  • 国家 KR

  • 入库时间 2022-08-21 21:25:24