首页> 外国专利> When it becomes operational status decision manner and operational status decision system null

When it becomes operational status decision manner and operational status decision system null

机译:何时变为运行状态决策方式和运行状态决策系统为空

摘要

PPROBLEM TO BE SOLVED: To quantify and provide an operation condition of an air conditioner. PSOLUTION: Monitoring information of the air conditioner 12 is transmitted to a remote monitoring center 18 from a data collector 14 connected via a public line 16. An information generation part 32 of the monitoring center 18 generates thermal output information from a continuous operation period of the air conditioner 12 and temperature difference from a set temperature during the continuous operation period. A memory part 36 stores the thermal output information as accumulated thermal output information at each predetermined period. A judgment part 34 judges operation condition of the air conditioner 12 based on the accumulated output information and a prototype for judgment of a database 38. PCOPYRIGHT: (C)2005,JPO&NCIPI
机译:

要解决的问题:量化并提供空调的运行条件。解决方案:空调器12的监视信息从经由公用线路16连接的数据收集器14传输到远程监视中心18。监视中心18的信息生成部32从连续运行中生成热输出信息。在连续运转期间中,空调装置12的设定时间和与设定温度的温度差。存储器部分36在每个预定时间段将热输出信息存储为累积的热输出信息。判断部34基于所累积的输出信息和用于数据库38的判断的原型来判断空调器12的运行状况。

版权:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号