首页>
外国专利>
In the operational planned decision device of the operational planned decision device of the generator and the generator which decides operational planned decision manner and
In the operational planned decision device of the operational planned decision device of the generator and the generator which decides operational planned decision manner and
展开▼
机译:在发电机的运行计划决策装置的运行计划决策装置中,发电机确定运行计划决策的方式和方式。
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To create a further economical firepower operation program, in an operation program creating device in a power system having a firepower/waterpower/pumped-hydropower generator.;SOLUTION: The operation program creating device includes: a firepower generator operation program creation processing part 4 which creates the firepower operation program related to a plurality of firepower generators on the basis of a predicted command prediction value; and a waterpower/pumped-hydropower generator operation program creation processing part 6 which satisfies a constrained condition including supply/command balance and an auxiliary capacity with respect to each firepower operation program created by the firepower generator operation program creation processing part 4, and creates a waterpower/pumped-hydropower operation program so that the operation cost of the firepower generator is reduced to the minimum as a whole. The firepower generator operation program creation processing part 4 reexamines a firepower-assessed demand based on the firepower operation program according to a waterpower generator output and a pumped-hydropower generator output brought about by the waterpower/pumped-hydropower generator operation program created by the waterpower/pumped-hydropower generator operation program creation processing part 6.;COPYRIGHT: (C)2009,JPO&INPIT
展开▼