首页> 美国政府科技报告 >Brief Reconnaissance Study for the Addition of Hydropower for Townsend Mill and Light Dam, Townsend, Tennessee.
【24h】

Brief Reconnaissance Study for the Addition of Hydropower for Townsend Mill and Light Dam, Townsend, Tennessee.

机译:田纳西州汤森镇Townsend mill和Light Dam增加水电的简​​要侦察研究。

获取原文

摘要

The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It was concluded that this site appears to be economically feasible for the development of hydroelectric power. (ERA citation 09:011706)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号