...
首页> 外文期刊>Ironmaking Conference Proceedings >Lowering the Cost of Iron Production: Improving Operating Cost Margins without Capital Cost Exposure Pulverized Coal Injection for Sparrows Point
【24h】

Lowering the Cost of Iron Production: Improving Operating Cost Margins without Capital Cost Exposure Pulverized Coal Injection for Sparrows Point

机译:降低铁的生产成本:在不增加资本成本的情况下提高运营成本利润率麻点喷煤粉

获取原文
获取原文并翻译 | 示例
           

摘要

DTE Energy Services develops, finances, owns, and operates coke-making, cogeneration, backup generation, pulverized coal injection, and other large industrial energy facilities. Raytheon Engineers & Constructors designs, procures, and constructs large projects for a broad range of industrial processes. BMH Claudius Peters AG provides grinding and injection technology, experience, and equipment of iron-making facilities throughout the world. These three firms have again collaborated to construct a pulverized coal injection plant. This is the second such project for this team in the last three years. The first project, which began injection in December of 1996, provides pulverized coal to the three blast furnaces at National Steel's Great Lakes Division. The current project will provide pulverized coal to Bethlehem Steel Corporation's 10, 000-ton/day blast furnace located as Sparrows Point, Maryland. Construction is underway with start-up scheduled for the second quarter of 2000. This paper discusses the roles of each of the key parties in developing the Sparrows Point project, and includes the following details: · Project organization, roles and structure. · Project implementation, engineering, procurement, and construction plans. · Equipment and process description. · Start-up and performance testing plan. · Benefits of a third-party developed and financed project.
机译:DTE能源服务部开发,融资,拥有和运营炼焦,热电联产,备用发电,煤粉喷射以及其他大型工业能源设施。雷神工程师与建筑商设计,采购和建造适合广泛工业流程的大型项目。 BMH Claudius Peters AG在全球范围内提供炼铁设备的研磨和注射技术,经验和设备。这三家公司再次合作建造了一座煤粉喷射厂。这是该团队近三年来的第二个此类项目。第一个项目于1996年12月开始注入,为国家钢铁公司大湖区的三个高炉提供煤粉。目前的项目将为位于伯利恒钢铁公司位于马里兰州麻雀角的10万吨/日/天的高炉提供煤粉。建设工作正在进行中,计划于2000年第二季度启动。本文讨论了发展Sparrows Point项目中每个关键方的作用,并包括以下细节:·项目的组织,作用和结构。 ·项目实施,工程,采购和施工计划。 ·设备和过程说明。 ·启动和性能测试计划。 ·第三方开发和资助的项目的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号