...
首页> 外文期刊>International Journal of Applied Engineering Research >Tools to Support the Decision-making in the Design and Operation of Activated Sludge Process for Municipal Wastewater Treatment in Developing Countries
【24h】

Tools to Support the Decision-making in the Design and Operation of Activated Sludge Process for Municipal Wastewater Treatment in Developing Countries

机译:支持发展中国家活性污泥工艺设计和运行中的决策的工具

获取原文
获取原文并翻译 | 示例
           

摘要

Facing the lack of information for the design of an activated sludge process for municipal wastewater treatment (7 m~3/s), pilot plant research has been conducted (0.5 L/s) in order to calibrate a mathematical model. Several specialized procedures as the measurement of oxygen transfer in clean and process water, determination of COD fractions, detailed wastewater characterization, among others, have been applied. Calibration of the activated sludge process model was implemented in BioWin 4.1 (EnviroSim). Once the model was calibrated, performance of several activated sludge process configurations was evaluated. Extrapolating the results to the case of Bogota (Colombia), once built the future large-scale wastewater treatment plants (20 m~3/s) are expected to remove phosphorous and nitrogen at a rate of a 12.9 t/d and 62.45 t/d respectively. Loads will be removed from discharge into the Bogota River. Pilot plant tests are necessary in developing countries facing lack of information to support decisions on wastewater treatment infrastructure planning, design and operation.
机译:面对缺乏设计用于城市污水处理的活性污泥工艺的信息(7 m〜3 / s),已经进行了试验工厂研究(0.5 L / s)以校准数学模型。已经应用了几种专门的程序,例如测量清洁和生产用水中的氧气传输,确定COD分数,详细的废水表征等。在BioWin 4.1(EnviroSim)中实现了活性污泥过程模型的校准。校准模型后,将评估几种活性污泥工艺配置的性能。将结果推算到波哥大(哥伦比亚)的案例中,一旦建成,未来的大型废水处理厂(20 m〜3 / s)有望以12.9 t / d和62.45 t / d的速率去除磷和氮。 d。货物将从排入波哥大河的水流中清除。在缺乏信息以支持废水处理基础设施规划,设计和运行决策的发展中国家,必须进行试点工厂测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号