首页> 外文期刊>Platt's Oilgram News >TransCanada pushes ahead on horn River pipe plans
【24h】

TransCanada pushes ahead on horn River pipe plans

机译:TransCanada推进霍恩河管道计划

获取原文
获取原文并翻译 | 示例
           

摘要

Vancouver-TransCanada is pressing ahead with pipeline additions in northeastern British Columbia at a time when producers and rival Spectra Energy are warning that without approval of plans to export LNG to Asia development of the region's Horn River shale basin faces delays. TransCanada said April 29 it has a contractual agreement to add 100,000 Mcf/d of natural gas pipeline capacity by 2014, rising to 300,000 Mcf/d by 2020 to an approved pipeline designed to feed 630,000 Mcf/d from Horn River to its Alberta network in 2014.
机译:在生产商和竞争对手Spectra Energy警告说,未经批准将LNG出口到亚洲的计划,该地区的Horn River页岩盆地开发面临延误之际,Vancouver-TransCanada一直在推进不列颠哥伦比亚省东北部的管道建设。 TransCanada于4月29日表示,它已签订合同协议,到2014年将天然气管道的日处理能力提高到100,000 Mcf / d,到2020年增加到300,000 Mcf / d,这条经批准的管道旨在将630,000 Mcf / d的天然气从霍恩河输送到阿尔伯塔省的阿尔伯塔网络。 2014。

著录项

  • 来源
    《Platt's Oilgram News》 |2011年第85期|共1页
  • 作者

    Gary Park;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号