首页> 外文期刊>Hydrocarbon Processing >Avoid these mistakes when installing a flare flowmeter
【24h】

Avoid these mistakes when installing a flare flowmeter

机译:安装火炬流量计时避免这些错误

获取原文
获取原文并翻译 | 示例
           

摘要

The new highly reactive volatile organic compound(VOC) regulations(HRVOC 30 TAG 115 Subpart H) addresses flares handling or potentially handling highly reactive VOCs at 5 wt% or higher concentrations.This new regulation requires that a continuous flowmeter will be installed,operated,calibrated and maintained on the flare system.On such systems,the selection and application of the flowmeter may vary depending on the organizational structure of the company.Some companies may out-source the entire project.
机译:新的高反应性挥发性有机化合物(VOC)法规(HRVOC 30 TAG 115 Subpart H)涉及火炬处理或潜在处理5 wt%或更高浓度的高反应性VOCs的新法规要求将安装,操作,在火炬系统上进行校准和维护。在此类系统上,流量计的选择和应用可能会根据公司的组织结构而有所不同。某些公司可能会将整个项目外包。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号