【24h】

Practice

机译:实践

获取原文
获取原文并翻译 | 示例
           

摘要

One of many contradictions that characterises construction contracts, whatever the procurement route, is the attritional nature of the relationship between the various construction team members. This is despite a veneer of co-operation and lack of blame culture. Technology, especially the current facility to transfer immense quantities of material between team members, assists both features. Independently of the advent of BIM, it has long been possible for parties to keep each other fully informed and impart extensive information electronically so that everyone can be properly kept in the loop.
机译:无论采购途径如何,构成施工合同的众多矛盾之一是各个施工团队成员之间关系的磨擦性质。尽管有单板的合作和缺乏责备的文化。技术,特别是当前在团队成员之间转移大量材料的设施,对这两个功能都有帮助。与BIM的出现无关,各方长期以来一直可能彼此保持充分了解并以电子方式传递广泛的信息,以便每个人都可以适当地保持联系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号