...
首页> 外文期刊>Structural engineering international >The Third Bosphorus Bridge: A Milestone in Long-span Cable Technology Development and Hybrid Bridges
【24h】

The Third Bosphorus Bridge: A Milestone in Long-span Cable Technology Development and Hybrid Bridges

机译:第三次博斯普鲁斯桥:长跨度电缆技术开发和混合桥中的里程碑

获取原文
获取原文并翻译 | 示例
           

摘要

The Yavuz Sultan Selim Bridge is a high-rigidity suspension bridge, combining stiffening stay cables and suspension cables. It features a 1408 m central span, and supports a railway and a motorway with a 58.5 m wide deck between stiffening stay cable anchorages. The design of the stiffening stay cables for this bridge required several developments to cater for the exceptional needs of the longest and heaviest stay cable in the world. The usual strand grade would not meet the project forces and 1960 MPa strands had to be qualified, for all the anchorage units within the range, up to 151 strands. Such qualification is, however, only the tip of the iceberg as many other tailor-made components had to be developed. Heavy-duty deviators needed to be proof tested for fatigue and wear and were a vitally important part of the design. Long-stroke hydraulic pistons had to be qualified for performance, long-term resistance to corrosion and ageing.
机译:Yavuz Sultan Selim桥是一种高刚性悬架桥,组合加强支撑电缆和悬架电缆。它具有1408米的中央跨度,并支撑铁路和高速公路,在加强支撑电缆锚地之间使用58.5米宽甲板。这种桥梁的加强挡泥电缆的设计需要若干开发,以满足世界上最长,最重的持续电缆的特殊需求。通常的Stranc等级不会符合项目部队,1960年MPA股票必须合格,所有锚地单位范围内,最多151股。然而,这种鉴定只有冰山的尖端,因为必须开发许多其他定制的组件。重型偏差器需要进行疲劳和磨损测试,并且是设计的一部分重要的一部分。长冲程液压活塞必须有资格进行性能,长期抵抗腐蚀和老化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号