首页> 外文会议>IABSE symposium on tomorrow's megastructures >The Third Bosphorus Bridge: an Important Milestone on Long-span Cable Technology Development
【24h】

The Third Bosphorus Bridge: an Important Milestone on Long-span Cable Technology Development

机译:第三座博斯普鲁斯海峡大桥:大跨度电缆技术发展的重要里程碑

获取原文

摘要

The Yavuz Sultan Selim Bridge is a high rigidity suspension bridge, combining stiffening cables and suspension cables. It features a 1.408 m central span and supports at the same time a railway and a motorway with a 59 m wide deck. The design of the stiffening cables for this bridge required several development to cater for the exceptional needs of the longest and heaviest stay cable in the world. The usual strand grade would not meet the project forces and 1960Mpa strands had to be qualified, for anchorage unit up to 151 strands. Such qualification is however only the tip of the iceberg as many other tailor-made components had to be developed. Heavy duty deviators needed to be qualified for fatigue and wear and were an utterly important part of the design. Long-stroke hydraulic pistons had to be qualified for performance, long-term resistance to corrosion and ageing.
机译:Yavuz Sultan Selim桥是一种高强度的悬索桥,结合了加劲索和悬索。它具有1.408 m的中心跨度,并同时支持宽59 m的铁路和高速公路。这座桥的加固电缆设计需要进行几项开发,以满足世界上最长和最重的斜拉索的特殊需求。通常的钢绞线等级无法满足项目部队的要求,必须对1960Mpa的钢绞线进行鉴定,最多可锚固151条钢绞线。但是,由于必须开发许多其他定制组件,因此这种资格鉴定只是冰山一角。重型偏斜器需要具备疲劳和磨损的资格,并且是设计中至关重要的一部分。长行程液压活塞必须具有性能,长期耐腐蚀和抗老化的资格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号