首页> 外文OA文献 >Discussion of 'Bibliography and Data on Cable-Stayed Bridges', by the Subcommittee on Cable-Stayed Bridges of the Committee on Long-Span Steel Bridges of the Committee on Metals of the Structural Division (Oct., 1977)
【2h】

Discussion of 'Bibliography and Data on Cable-Stayed Bridges', by the Subcommittee on Cable-Stayed Bridges of the Committee on Long-Span Steel Bridges of the Committee on Metals of the Structural Division (Oct., 1977)

机译:结构部金属委员会大跨度钢桥委员会斜拉桥小组委员会对“斜拉桥书目和数据”的讨论(1977年10月)

摘要

The writer would like to point out the existence of a very remarkable Spanish cable-stayed bridge built in 1925, wich is thus older than the first one recorded by the authors (and probably the pioneer in concrete-deck type). The Tempul Aqueduct was designed by the famous Professor Educardo Torroja. The deck is a concrete box girder sustained by two planes of 3 mm diam 37-wire double cables working at 27 kg/mm2.
机译:作者想指出的是,存在一座建于1925年的非常出色的西班牙斜拉桥,因此它比作者所记录的第一座桥(可能是混凝土桥面类型的先驱者)更古老。 Tempul渡槽由著名的Educardo Torroja教授设计。甲板是一个混凝土箱形梁,由两个平面以3毫米直径的37线双芯电缆支撑,以27千克/平方毫米的速度工作。

著录项

  • 作者

    Alarcón Álvarez Enrique;

  • 作者单位
  • 年度 1978
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号