首页> 外文期刊>The New Zealand Railway Observer >From the Top of the Raurimu Spiral
【24h】

From the Top of the Raurimu Spiral

机译:从Raurimu螺旋的顶部

获取原文
获取原文并翻译 | 示例
           

摘要

Saturday 19 September is the day when New Zealand elects a new government. In the lead-up to that day there will be a lot of politicking and promises that may or may not be kept. Transport issues, and rail in particular, appear to be prominent in the political arena. KiwiRail, a State Owned Enterprise, is caught up in these events. KiwiRail began running the TranzAlpine on 4 July on weekends and during the school holidays in July and August, and will then reassess the operation. It is understood that because a large number of overseas tourists travelled on the iconic train KiwiRail was not keen to restart the train until the borders reopened. Political pressure forced an early resumption of the service, even on a limited basis.
机译:9月19日星期六是新西兰选举新政府的日子。在那天的领先地位,将会有很多政治和承诺可能或可能不会被保存。特定运输问题和铁路似乎在政治舞台上突出。据国家企业,kiwirail陷入了这些活动。 Kiwirail于7月4日和8月在学校假期期间开始在7月4日和学校假期开始运行Tranzalpine,然后重新评估该行动。据了解,因为大量的海外游客在标志性的火车上旅行的kiwirail并不热衷于重新开始火车,直到边界重新开放。政治压力强迫恢复服务,甚至是有限的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号