首页> 外文期刊>The New Zealand Railway Observer >The Rebuilding of the Aramoho Railway Bridge
【24h】

The Rebuilding of the Aramoho Railway Bridge

机译:亚马逊铁路桥的重建

获取原文
获取原文并翻译 | 示例
           

摘要

All site work until now (July, 1961) has been executed by railway gangs. The steelwork has been fabricated at the railway workshops at Lower Hutt and East Town. Contracts have been let for constructing the extra pier and for the stressing of the northern abutment.
机译:所有网站工作到现在(1961年7月)已被铁路帮派执行。钢结构在下赫特和东镇的铁路车间制造。合同已经让额外的码头和北方基台的强调来构建额外的码头。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号