The paper deals with the construction of an RCC Box curved box bridge below the existing arches of a bridge. Since the arch bridge was about 100 years old and the load carrying capacity of trains has increased over the years, the re-habilitation and re-construction of such bridges was required. In the South Western Railway system, there are about 622 such bridges safely carrying the present loading standard of the Railways, yet, on a programmed basis, rehabilitation and reconstruction of such bridges is required otherwise they will start failing in due course. Therefore, the work of rehabilitation by epoxy grouting, guniting/shotcreting and in some cases, building a new bridge in a curved shape for taking the complete load of the trains is required. This paper describes the method of constructing a new RCC curved box bridge, underneath the arches of an existing bridge, which is designed to take the 25-ton axle load of modern-day trains.
机译:本文讨论了在桥梁的现有拱门下方建造RCC箱形曲线箱形桥的方法。由于拱桥已有大约100年的历史,并且火车的承载能力在过去的几年中有所增加,因此需要对这种桥进行修复和重建。在西南铁路系统中,大约有622座这样的桥梁安全地满足了铁路目前的装载标准,但是在计划的基础上,需要对这些桥梁进行修复和重建,否则它们将在适当的时候开始失效。因此,需要通过环氧树脂灌浆,喷浆/喷射混凝土进行修复工作,在某些情况下,还需要以弯曲的形状建造新桥以承受列车的全部载荷。本文介绍了一种在现有桥梁的拱形下方建造新的RCC曲线箱形桥的方法,该方法旨在承受25吨轴重的现代火车。

著录项

  • 来源
    《The Indian concrete journal》 |2011年第6期|p.56-60|共5页
  • 作者

    R.S. Dubey;

  • 作者单位

    holds a B.E. (Civil) from NT Roorkee, M.B.A;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号