首页> 外文期刊>The New Zealand Railway Observer >From the Top of the Raurimu Spiral
【24h】

From the Top of the Raurimu Spiral

机译:从劳里木螺旋的顶端

获取原文
获取原文并翻译 | 示例
           

摘要

At the beginning of December last year Dunedin Railways, without consultation, announced that as from January the railway would no longer operate the stretch of track between Pukerangi and Middlemarch 'for the foreseeable future'. This decision took the 70% shareholder of Dunedin Railways - Dunedin City Council, the community of Middlemarch and railway enthusiasts, by surprise and has caused much discontent in the communities that are served by the railway.
机译:去年12月初,达尼丁铁路公司未经协商就宣布,从1月起,该铁路将不再在Pukerangi和Middlemarch之间开辟一段可预见的未来。这一决定使达尼丁铁路公司的70%股东-达尼丁市议会,米德尔马奇社区和铁路爱好者感到惊讶,并引起了铁路服务社区的不满。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号