...
首页> 外文期刊>Tramways & Urban Transit >BCCE construction begins and 60 years remembered
【24h】

BCCE construction begins and 60 years remembered

机译:BCCE开始建造,至今已有60年的历史了

获取原文
获取原文并翻译 | 示例
           

摘要

After months of utility works along the route of Midland Metro's Birmingham City Centre Extension project, construction of the new line began in earnest during August. The UK project involves creating a 1.4km (0.9-mile) link between Birmingham's Snow Hill station and the new entrance to New Street. Balfour Beatty is responsible for designing, constructing, testing and commissioning the new GBP18.6m (EUR21.6m) tramway. In addition to the new infrastructure, the project involves substantial improvements to the public realm including natural stone paving, street furniture, lighting and landscaping. Operational service is to be introduced in 2015.
机译:在Midland Metro的伯明翰市中心扩建项目沿线进行了数月的公用工程之后,新线的建设工作于8月正式开始。英国项目涉及在伯明翰的Snow Hill车站和新街的新入口之间建立1.4公里(0.9英里)的连接。 Balfour Beatty负责设计,建造,测试和调试新的1,860万英镑(2,160万欧元)电车轨道。除新的基础设施外,该项目还涉及对公共领域的重大改进,包括天然石材铺路,街道家具,照明和美化环境。将于2015年推出运营服务。

著录项

  • 来源
    《Tramways & Urban Transit》 |2013年第910期|414-414|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号