Construction schedule review in GIS with a navigable 3D animation of project activities

机译:使用项目活动的可导航3D动画在GIS中审查施工进度

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a Geographic Information Systems (GIS) based navigable 3D animation of project activities to visualise and review a construction project schedule as an alternative to the existing 4D CAD tools. Most of the commercial tools allow planners to build a 4D model but lack features like generation and manipulation of developed 4D model on a single platform. To facilitate the 4D model manipulation, both 3D model and the project schedule are developed within GIS. However, models generated by using popular commercial tool like y and the schedule generated in Primavera or Microsoft Project can also be utilised within the proposed approach. The animation of the project activities utilises dynamic linkage between activities of the schedule and the corresponding 3D components, thus, allowing detection of missing activities and logical errors in the project schedule. The database management capabilities of GIS are also utilised to maintain and update the construction resource database to facilitate the project planning. Most of the existing 4D technologies do not have project management capabilities and are used mainly for planning and design phases of a project. GIS based approach suggested in this paper may be used as the project management tool at any stage of the project. Along with 'what' is to be built 'when', a navigable 3D GIS based animation conveys 'where' in the space and offer powerful schedule visualisation, planning and querying capabilities.
机译:本文介绍了一个基于地理信息系统(GIS)的项目活动可导航3D动画,以可视化和查看施工项目进度,以替代现有4D CAD工具。大多数商业工具允许计划人员构建4D模型,但缺少诸如在单个平台上生成和操纵已开发4D模型的功能。为了方便4D模型操作,在GIS中同时开发了3D模型和项目进度表。但是,通过使用流行的商业工具(例如y)生成的模型以及在Primavera或Microsoft Project中生成的进度表,也可以在建议的方法中利用。项目活动的动画利用进度计划活动和相应的3D组件之间的动态链接,从而允许检测项目进度表中缺少的活动和逻辑错误。 GIS的数据库管理功能还用于维护和更新施工资源数据库,以方便项目规划。现有的大多数4D技术都不具有项目管理功能,主要用于项目的计划和设计阶段。本文建议的基于GIS的方法可以在项目的任何阶段用作项目管理工具。与“何时”构建“什么”一起,可导航的基于3D GIS的动画传达了空间中的“位置”,并提供了强大的时间表可视化,计划和查询功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号