首页> 外文期刊>Engineering news-record >Panama's Canal Holds Visions of New Growth
【24h】

Panama's Canal Holds Visions of New Growth

机译:巴拿马运河抱有新增长的愿景

获取原文
获取原文并翻译 | 示例
           

摘要

Standing on a barge cruising through the Panama Canal's Gaillard Cut, Maximiliano DePuy beams proudly. The geotechnical engineer for the Panama Canal Authority points to the 539-ft-high Gold Hill promontory on one side of the waterway, from which 75 ft of rock has been cut out since 1986. On the opposite bank looms Contractor's Hill, already reduced to 370 ft in previous work. Stabilizing the canal's landslide-prone slopes metaphorically represents protecting a precious pathway for Panama, owner of the 51.2-mile-long construction landmark since 2000, when the U.S. turned it over to the locally run Panama Canal Authority.
机译:Maximiliano DePuy站在驳船上,穿越巴拿马运河的盖拉德切(Gaillard Cut),并自豪地微笑着。巴拿马运河管理局的岩土工程师指出,在水路一侧的539英尺高的Gold Hill海角,自1986年以来已切掉了75 ft的岩石。在对岸,织机承包商的Hill已经缩小为先前的工作是370英尺。稳定运河易发生滑坡的斜坡比喻为巴拿马保护了一条宝贵的道路。巴拿马自2000年以来一直是51.2英里长的建筑地标的所有者,当时美国将其移交给了当地运营的巴拿马运河管理局。

著录项

  • 来源
    《Engineering news-record》 |2001年第5期|p.46-48|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号