CONTRACTOR SAYS HOOVER DAM RULING WOULD CHANGE ALL RULES

机译:承包商说胡佛大坝裁决将更改所有规则

获取原文
获取原文并翻译 | 示例
           

摘要

A Legal Cliffhanger Looks almost as worrisome for PCL Construction Services Inc. as the physical challenges in building the Hoover Dam Visitor Center. The Denver-based company is seeking $32.4 million for breach of contract and retained money on top of $36.5 million already received from the Bureau of Reclamation for the project. But a federal judge is putting most of the blame on PCL for taking 44 months to complete the 22-month contract. PCL plans to appeal that ruling from the U.S. Court of Federal Claims after it is formalized next month.
机译:对于PCL Construction Services Inc.来说,一名法律顾问似乎与建造胡佛水坝游客中心的实际挑战一样令人担忧。这家总部位于丹佛的公司正在寻求3240万美元的违约金和保留款,此外,该公司还已经从垦殖局收到了3650万美元的款项。但是,联邦法官将PCL花费了44个月才能完成22个月的合同,这归咎于PCL。 PCL计划在下个月正式确定该裁决后,向美国联邦索赔法院上诉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号