Time, cost, and environmental impact analysis for sustainable design at multiple building levels.

机译:在多个建筑物级别进行可持续设计的时间,成本和环境影响分析。

获取原文
获取原文并翻译 | 示例

摘要

Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated.;The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO 2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.
机译:建设项目是一项复杂的工作,需要不同专业学科的参与才能实现通常相互冲突的各种项目目标。建设项目的复杂程度和多目标性质使其可以进行协作设计和建设,例如集成项目交付(IPD),在项目构想,设计和建设过程中,相关学科可以一起工作。传统上,建设项目的主要目标是在最短的时间内以最低的成本进行建造,因此,成本与时间之间固有的和公认的关系一直是许多研究的重点。广泛的研究强调了在建筑施工中能够有效地模拟多个目标之间的关系的重要性。通常,时间和成本之间的权衡关系是众所周知的,并且对此有足够的研究。然而,尽管进行了可持续的建筑设计,但尚未充分研究时间与环境影响之间以及成本与环境影响之间的关系。本研究的目的主要是分析和确定时间,成本与环境影响之间的关系,在建筑物的不同级别上的二氧化碳排放量方面:在使用前阶段(包括制造和建造)的材料级别,组件级别和建筑物级别,以及生命周期成本与生命周期中二氧化碳排放量之间的关系相。此外,本研究旨在开发一种强大的基于仿真的多目标决策支持工具SimulEICon,该工具考虑了施工数据的不确定性,并且能够将生命周期评估信息纳入决策过程。这项研究的结果支持了不同建筑水平下时间与成本之间的权衡关系。此外,时间和CO 2排放关系在使用前阶段表现出权衡的行为。成本和二氧化碳排放量之间关系的结果在使用前阶段有趣地成比例。从构建到使用阶段,相同的模式不断出现。了解这些目标之间的关系是成功规划和设计环境可持续建筑项目的关键。

著录项

  • 作者

    Inyim, Peeraya.;

  • 作者单位

    Florida International University.;

  • 授予单位 Florida International University.;
  • 学科 Civil engineering.;Management.;Engineering.
  • 学位 Ph.D.
  • 年度 2015
  • 页码 190 p.
  • 总页数 190
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词