首页> 外文会议>Down to Earth Conference >Power system earthing – its commissioning and test errors
【24h】

Power system earthing – its commissioning and test errors

机译:电力系统接地 - 其调试和测试错误

获取原文

摘要

This paper is a case study of an earthing system commissioning test, the associated errors and how to compensate for them. When measuring the impedance of an earth grid it is important to realise that there are many factors that can influence the test results. Inductive coupling between the current lead and remote earth lead and not being at remote soil potential are such factors that must be considered when determining the earth grid impedance. Often, errors due to inductive and conductive coupling are unavoidable because of the layout of the test circuit and the size of the earthing system or existence of MEN, transmission or distribution power lines, etc. For this reason, computer modelling is essential to correct interactions between the test circuit and earth grid under test, and interactions within the test circuit itself.
机译:本文是对接地系统调试测试,相关错误以及如何弥补它们的案例研究。当测量地球网格的阻抗时,重要的是意识到有许多可能影响测试结果的因素。当前引线和远程地球铅之间的电感耦合而不是处于偏远的土壤电位,是在确定地球电网阻抗时必须考虑的因素。通常,由于电感和导电耦合导致的误差是不可避免的,因为测试电路的布局和接地系统的尺寸或男性,传输或分配电源线等的存在。因此,计算机建模对于纠正交互至关重要在测试电路和地球网格之间进行测试,以及测试电路本身内的相互作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号