Research on Shear Lag Effect of Three-span Continuous Curved Steel Box Girder Bridge

机译:三跨连续弯曲钢箱梁桥剪力滞效应研究

获取原文

摘要

The normal stress of box-section beam under symmetrical load is the non-uniform characteristic called shear lag effect.Based on actual engineering project,the plate-beam finite element method is used to study the shear lag effect of the three-span continuous-curve steel box-girder bridge under the variety conditions of the curve radius,and the width span ratio,and the distribution of the shear lag effect in the longitudinal and horizontal direction under the symmetrical load are summarized in this paper,providing references for design of steel box-girder bridge.The results show that the shear lags of steel box girders are all positive shear lags under symmetrical loads.Under the conditions of three parameters,the curve radius and the width-span ratio have a great influence on the shear lag effect of steel box girders,and the high-span ratio change has no obvious effect on the shear lag effect,and the shear lag effect of bottom plate is far less severe than the top plate.
机译:对称负荷下箱段光束的正常应力是剪切滞后效果的非均匀特性。基于实际工程项目,使用板束有限元方法来研究三跨连续的剪切滞后效果 - 曲线钢箱梁桥在曲线半径的常态条件下,以及宽度跨度比的剪切滞后效应在对称负荷下的纵向和水平方向上的分布,在该论文中总结了,提供了用于设计的参考结果表明,钢箱梁的剪切滞后是对称负荷下的所有正剪切滞后。在三个参数的条件下,曲线半径和宽度跨度比对剪切滞后有很大影响钢箱梁的影响,高跨度比变化对剪切滞后效果没有明显影响,底板的剪切滞后效果远低于顶板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号