首页> 外文会议>SPE Kuwait Oil Gas Show and Conference >Production Enhancement Strategy in Lower Burgan Reservoir: Greater Burgan Field, Kuwait
【24h】

Production Enhancement Strategy in Lower Burgan Reservoir: Greater Burgan Field, Kuwait

机译:下伯根根储层生产增强策略:大伯根田,科威特

获取原文

摘要

A comprehensive development strategy for BGSL1 reservoir of Burgan Formation, deposited in Lower Cretaceous, of Greter Burgan field, Kuwait was formulated to increase the production of the low productive heterogeneous reservoir. The BGSL1 reservoir was deposited in shore face dominated coastline with protected tidal bay. The heterogeneous nature and low Sand: Shale ratio makes development of this important reservoir difficult. After studying the production performance of BGSL1 reservoir, mainly four technical challenges are identified. These are 1) wet production, 2) low productivity index, 3) short self-flow life and frequent work over needed and 4) Complexity in terms of lower API crude, multiple oil-water contacts and heterogeneity. Initial study for BGSL1 reservoir was started by revisiting all the wells drilled to BGSL1 reservoir. Remaining Oil distribution maps of each sub-layer were prepared which had given clear understanding of potential of this reservoir. BGSL1 reservoir remaining oil map was divided into several compartments. On the basis of volume, 24 compartments were identified as under-developed in terms of their current off-take rate to current remaining oil volume. Some of the compartments are preferred for development than other due to development opportunities for more than one reservoir. Development of BGSL1 is highly challenging. The reservoir may require planning single dedicated completions with artificial lift. A novel approach was adopted to screen the candidates for artificial lift, which was based on highly underperforming wells, where self-flow with good rate is not possible due to high water cut and declining production. Evaluation of these ESP candidates were done with remaining oil column, bypassed oil & partially swept zone potential with rock quality, PI measurement and historical plot of liquid rate & water cut to review the well deliverability and to estimate water cut with ESP. The technical challenges were resolved to a great deal. For reservoir complexity like multiple oil-water contacts & heterogeneity, unit wise estimation of remaining oil has helped. High viscosity oil mapping helped to isolate low API / high viscous oil. It was seen that study helped to achieve a rise of oil production and using these practices helped to reach highest production over last decade.
机译:科威特沉积在低白垩纪的BGSL1 BGSL1储存战略的综合发展战略,沉积在克拉特伯根田,Kuwait,增加了生产低生产性异构储层的生产。 BGSL1储存器沉积在岸面占主架的海岸线,受保护的潮汐湾。异质性质和低砂:页岩比使得这一重要水库的发展变得困难。在研究BGSL1水库的生产性能之后,主要确定了四种技术挑战。这些是1)湿润的生产,2)低生产率指数,3)短流动寿命和频繁的工作和4)在下部API原油,多种油水接触和异质性方面的复杂性。通过重新探测钻到BGSL1水库的所有井来开始对BGSL1水库的初步研究。制备每个子层的剩余油分布图,这已经明确了解该储层的潜力。 BGSL1储库剩余的油图分为几个隔间。在体积的基础上,在其目前的余量率至于当前剩余的油量方面,确定了24个隔间。由于多个水库的发展机会,一些隔间优选地开发而来的开发。 BGSL1的发展是强大的具挑战性。水库可能需要用人工升力计划单一专用完成。采用一种新颖的方法来筛选人工升力的候选人,这是基于高度表现良好的井,因为由于高水切割和生产下降,不可能具有良好速率的自流。对这些ESP候选人的评估是通过剩余的油柱,绕过油和部分扫过的带岩石质量,PI测量和液体速率和水的历史曲线造成的液体速度和液体曲线图来审查良好的可递送性,并用eSP估算水。技术挑战得到了很大的决定。对于储层复杂性,如多种油水触点和异质性,剩余油的单位明智估计有所帮助。高粘度油映射有助于分离低API /高粘性油。有人看来,研究有助于实现石油生产的崛起,并使用这些做法有助于达到最近十年的最高产量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号