首页> 外文会议>International Conference on Machine Tool Technology and Mechatronics Engineering >Application of GM(1, 1) Model Established by Moving Average Method in Stress Prediction of Rigid Frame Bridge Construction
【24h】

Application of GM(1, 1) Model Established by Moving Average Method in Stress Prediction of Rigid Frame Bridge Construction

机译:通过移动平均法建立的GM(1,1)模型在刚性框架桥梁施工中的应力预测中建立

获取原文

摘要

Stress variation is complicate during the course of rigid frame bridge construction, it is difficult to grasp the development trend of stress because of too many influencing factors. When using GM(1, 1) model solely, the prediction accuracy is low and it is critical to collect much raw data of stress. Method of moving average improves GM(1, 1) model by processing data before modeling. The paper takes Hu Lu-ding Bridge as an example and the results show that the GM(1, 1) model established by moving-average method has higher prediction accuracy and can be efficiently used in stress prediction of rigid frame bridge.
机译:在刚性框架桥梁施工过程中,应力变化在刚性框架桥梁施工过程中复杂,因此由于影响因素太多,难以掌握压力的发展趋势。仅使用GM(1,1)模型时,预测精度低,并且收集大量压力数据至关重要。移动平均方法通过在建模之前处理数据来改善GM(1,1)模型。本文以HU LU-DING桥为例,结果表明,通过移动平均方法建立的GM(1,1)模型具有更高的预测精度,并且可以有效地用于刚性框架桥的应力预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号