首页> 外国专利> Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole, and construction method thereof

Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole, and construction method thereof

机译:组合式刚架桥,将预应力复合梁安装到刚架桥板的交点处,并将其连接到安装在杆上部的钢构件上,其施工方法

摘要

The present invention is a portion of the negative moment interval and the negative moment region of both ends of the slab of the column upper end, depending on the load stresses acting on the rigid frame bridge, and the synthesis of the steel and the concrete, a portion of the frontal ment section of the slab is prestressed composite beam install a portion of the negative moment zone of curing pouring reinforced concrete after connecting with steel installed in the negative moment zone, and the pillars upper end a is a steel and concrete, the remaining section of the column is to install the pillars of reinforced concrete It relates to a method of installing a composite rigid frame bridges to resist external forces such as lateral earth pressure. ; Predetermined period of pillars and slabs of composite rigid frame bridge is installed in the above manner was brought to minimize the cross-section compared to the conventional reinforced concrete cross-section to install a composite of steel and concrete reduces the dead weight a predetermined period of frontal ment section of the slab is Priest Since installing the rest hameuroseo thinner than conventional reinforced concrete composite beam cross section has the advantage that it can be secured hyeongha larger than the area of ​​the bridge.
机译:根据作用在刚性框架桥上的载荷应力以及钢和混凝土的合成,本发明是柱上端平板两端的负弯矩区间和负弯矩区域的一部分,平板的前部截面的一部分是预应力复合梁,与安装在负弯矩区域的钢连接后,安装了一部分固化的浇注钢筋混凝土的负弯矩区域,而支柱的上端a是钢和混凝土,柱子的其余部分是安装钢筋混凝土柱。它涉及一种安装复合刚性框架桥以抵抗诸如横向土压力的外力的方法。 ;以上述方式安装预定的复合刚性框架桥的柱和平板的周期使横截面最小化,与传统的钢筋混凝土横截面相比,安装钢和混凝土的复合材料可减少自重的预定周期平板的正面部分是Priest,因为将其余的hameuroseo安装得比传统的钢筋混凝土复合梁横截面更薄,因此具有可以将hhinha固定为比桥梁面积更大的优点。

著录项

  • 公开/公告号KR100543969B1

    专利类型

  • 公开/公告日2006-01-20

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20030088116

  • 发明设计人 김회준;김창래;장성묵;

    申请日2003-12-05

  • 分类号E01D21/00;

  • 国家 KR

  • 入库时间 2022-08-21 21:24:27