首页> 外文会议>International Conference ondvanced Measurement and Test >The Risk Measurement of the Space Launch Test Project Based on Gray Relational Analysis
【24h】

The Risk Measurement of the Space Launch Test Project Based on Gray Relational Analysis

机译:基于灰色关系分析的空间发射试验项目的风险测量

获取原文

摘要

The special nature of space launch test projects requires ground personnel to reduce the occurring probability of risk and ensure the success of the projects to the greatest extents. Hence how to accurately identify, measure, control and manage risk through effective measurement is currently a focus of risk management for space launch test projects. This paper identifies risk factors in all the stages of the space launch test projects, and analyzes and sorts them based on the gray relational degree. The results offer advices for ground personnel to make more precisely identification and control of risk.
机译:太空发射试验项目的特殊性质需要地面人员减少风险的发生可能性,并确保项目的成功到最大的范围。因此,如何通过有效测量准确地识别,测量,控制和管理风险,目前是空间发射测试项目的风险管理的重点。本文识别空间发射测试项目的所有阶段的风险因素,并根据灰色关系度分析并对其进行排序。结果为地面人员提供了建议,以更精确地识别和控制风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号