首页> 外文会议>ISG*ISARC World Conference >Change and contract management modules of intelligent-rogram management information systems (i-PgMIS) for urban renewal projects
【24h】

Change and contract management modules of intelligent-rogram management information systems (i-PgMIS) for urban renewal projects

机译:对城市更新项目的智能Rogram管理信息系统(I-PGMI)的变更和合同管理模块

获取原文

摘要

Purpose In recent times, urban renewal (UR) projects actively try to improve residential environments and recover functions of an urban infrastructure. These projects move forward simultaneously as multiple projects, rather than as one single project. To cope with this, program management techniques and a comprehensive management system which is based on these techniques are required. For this purpose the research team has developed an intelligent program management information system, i-PgMIS, that can efficiently manage and support urban renewal projects during the entire life cycle. Method: The system provides cost management, duration management, risk management, performance management, green VE/LCC (Value Engineering/Life Cycle Cost), change management, contract management, an emanual, and conflict management for UR-projects. This paper details the research that focuses on the change management and the contract management modules. Motawa et al. proposed a change management system for construction projects at project level by using the dynamic planning system based on fuzzy logic, and Zhao et al. proposed a prediction change management system for each activity at the construction phase by using the dependency structure matrix (DSM). In this study, change factors that commonly occur in UR-projects were first deducted by using the analytic network process (ANP), and the possibility of the change was estimated by using a Likert-scale. There is no specific method in the contract management module. The module focuses on how to manage contractors' information, the collection of the contract documents, execution of the costs referred to in the contract documents, and so forth. Results & Discussion Since many changes take place and multiple contracts are signed during the progress of a mixed-use development project such as urban renewal projects, efficient management is essential to handle these projects successfully. It is expected that the project manager is able to efficiently manage contract duties and respond to a number of changes such as cost overrun and schedule delay during the project through the change management and contract management modules, as developed in this paper.
机译:目的是最近,城市更新(UR)项目积极地试图改善住宅环境和城市基础设施的恢复功能。这些项目同时向前移动,而不是一个项目。为应对这一点,需要基于这些技术的程序管理技术和全面的管理系统。为此目的,研究团队开发了一个智能计划管理信息系统I-PGMI,可以在整个生命周期中有效地管理和支持城市更新项目。方法:该系统提供成本管理,持续时间管理,风险管理,绩效管理,绿色VE / LCC(价值工程/生命周期成本),改变管理,合同管理,对UR项目的弹性管理。本文详细介绍了专注于变更管理和合同管理模块的研究。 Motawa等人。基于模糊逻辑的动态规划系统,提出了项目级别的建设项目变更管理系统,ZHAO等。通过使用依赖结构矩阵(DSM)提出了用于施工阶段的每个活动的预测变化管理系统。在这项研究中,首先使用分析网络进程(ANP)扣除常见于UR项目中的变化因素,并且通过使用李克特级估计变更的可能性。合同管理模块中没有特定方法。该模块侧重于如何管理承包商的信息,合同文件的收集,合同文件中提到的成本等等。结果与讨论,因为在城市更新项目等混合使用开发项目的进展过程中签署了许多变化和多重合同,有效的管理对于成功处理这些项目至关重要。预计项目经理能够有效地管理合同职责,并通过本文开发的更改管理和合同管理模块在项目期间响应成本超支和计划延迟等更改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号