Risk analysis and control in the Yellow River-crossing tunnel of South-to-North Water Diversion East Line

机译:南北河流转移东线黄河交叉隧道风险分析与控制

获取原文

摘要

The life-cycle of the Yellow River-crossing tunnel is divided into six stages, including planning, design, bidding, construction, operation, maintenance, and disposal. To ensure the safety of the tunnel during various stages, the concept of life-cycle risk management is introduced. The article identified the risks in all stages and proposed corresponding measures for risk controlling, some of which were already applied in the project and achieved good effect.
机译:黄河过隧道的生命周期分为六个阶段,包括规划,设计,竞标,建筑,操作,维护和处置。为确保在各个阶段的隧道安全,引入了生命周期风险管理的概念。本文确定了所有阶段的风险,并提出了相应的风险控制措施,其中一些已在该项目中申请并取得了良好的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号