首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Research on fast Construction Technology of east roadway in HuaHeng Coal Mine
【24h】

Research on fast Construction Technology of east roadway in HuaHeng Coal Mine

机译:华盛煤矿东部巷道快速施工技术研究

获取原文

摘要

By analyzing various factors which influence and constraint roadway construction speed in huaheng coal mine, some improved technical measures about fast construction are introduced, such as improve blasting technology, choose appropriate rock breaking equipment and improve the fast construction supporting facilities, select the right support patterns and scientific construction organization management. Take east roadway in huaheng coal mine as example, there are three key aspects: the method of mucking and haulage, drilling and blasting techniques and supporting technology. In solving the problem of loading and transport, some mechanized equipments such as LW150C bucket loader, SSD(B)20 shuttle mining car and CMJ17A full-hydraulic excavating jumbo are used, and the mechanized organization such as loading, transfer, transport and unloading is innovated. By improving bolt installation construction technology and optimizing construction management to achieve simultaneously operating of multiple procedure, increase drilling speed and shorten mucking time, which improved the roadway excavation speed and security significantly.
机译:通过分析各种因素,这些因素在华盛煤矿的影响和约束巷道建设速度,引入了快速建设的一些改进技术措施,如改善爆破技术,选择合适的岩石破碎设备,改善快速施工配套设施,选择合适的支持模式科学施工组织管理。以华盛煤矿东道为例,有三个关键方面:解体和拖运,钻井和爆破技术和支持技术。在解决装载和运输问题时,使用一些机械化设备,如LW150C铲斗装载机,SSD(B)20往复采矿汽车和CMJ17A全液压挖掘巨型巨型巨型巨型巨型巨型巨型巨型速度,以及装载,转移,运输和卸载等机械化组织创新。通过改善螺栓安装施工技术和优化施工管理,同时运行多个程序,提高钻孔速度和缩短破坏时间,显着提高了巷道挖掘速度和安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号