首页> 外文会议>Symposium on Building Facade Maintenance, Repair, and Inspection >Designer-Led Design/Build - Alternative Project Delivery Method for Facade Evaluation and Repair Projects - Case Study on an 11 Story Apartment Building
【24h】

Designer-Led Design/Build - Alternative Project Delivery Method for Facade Evaluation and Repair Projects - Case Study on an 11 Story Apartment Building

机译:设计师 - LED设计/建立 - 门面评估和修复项目的替代项目交付方法 - 案例研究11楼公寓楼

获取原文

摘要

Traditional Design/Bid/Build project delivery methods are inherently cumbersome for complex facade repair programs. The repair program on an 11 - story apartment building is documented, demonstrating the aspects and benefits of utilizing a Design/Build contracting approach, with the Design-Professional leading the repair program. The project begins with an assessment that concludes with the recommendation to replace the facade. Early evaluation efforts document the need for immediate safety/ stabilization measures, then progress through the successful delivery of a complex facade repair program under a project delivery method that is growing in acceptance.
机译:传统的设计/出价/构建项目交付方法本质上对复杂的外立面维修计划本身繁琐。记录了11层公寓楼的维修计划,展示了利用设计/建造承包方法的方面和好处,设计专业领导维修计划。该项目始于评估,结论为取代立面的建议。早期评估努力记录了立即安全/稳定措施的必要性,然后通过成功交付在遭受的项目交付方法下成功交付复杂的外立面修理计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号