首页> 外文会议>IADC/SPE Asia Pacific Drilling Technology >Old Working Relationship Model Test in a New Location-Integrated Project Management in Western Siberia
【24h】

Old Working Relationship Model Test in a New Location-Integrated Project Management in Western Siberia

机译:在西伯利亚西部地区新的综合项目管理中的旧工作关系模型试验

获取原文

摘要

The history of integrated services is a decade old, yet the concept has found new application. A new contract model whereby certain services were contracted to drill horizontal wells on a lump-sum fee basis enhanced the existing relationship between operator and service company. The workscope covered provision of downhole drilling services, tools, and equipment to a maximum total measured depth. Conventional and slim design well options were considered, and equipment specifications were decided to provide flexibility, depending on ongoing reservoir modeling results and production forecasts. A joint project team consisting of the operator and three principal contractors (namely integrated drilling services, drilling fluids, and rig) spudded the first well in January 2003 with a heavy land rig in the arctic drilling environment. Drilling of the first well with a conventional well design (8 1/2-in. horizontal drain) took longer than initially planned, partly because of high nonproductive time (NPT) that was related to harsh winter conditions, and partly because of workscope changes. However, the second well was finished as the fastest horizontal well drilled to date by the operator, in two-thirds of the scheduled time. Slim-well design, fit-for- purpose equipment and technology selection, improved mud system for intermediate hole sections, and close operational coordination among four participating companies were among the factors resulting in the benchmark performance. Another key component of the success has been setting of project objectives and targets for quality, health, safety, and environment (QHSE) issues, which were also reviewed by an experienced project startup audit. The review identified critical areas for improvement and thereby facilitated the project's success. The remedial work plan based on the review contributed to the performance improvement in a short time.
机译:综合服务的历史是十年的历史,但该概念已找到新的应用程序。一项新的合同模式,某些服务的合同签约以钻取水平井,在一次性费用基础上增强了运营商和服务公司之间的现有关系。工作科普源将井下钻井服务,工具和设备提供给最大的省略深度。考虑了常规和纤薄的设计井选项,并决定设备规范,根据正在进行的储层建模结果和生产预测,提供灵活性。由运营商和三名主要承包商(即集成钻井服务,钻井液,钻井平台)组成的联合项目团队,于2003年1月在北极钻井环境中拥有一股良好的良好井。使用传统的井设计钻孔(8个1/2英寸。水平排水)比最初计划的时间更长,部分原因是与寒假冬季条件有关的高性能时间(NPT),部分是因为工作效果变化。然而,第二个井作为经营者迄今为止钻取的最快水平井,在预定时间的三分之二。纤薄井设计,适合设备和技术选择,改进的中间孔部分泥浆系统,以及四家参与公司之间的近距离协调是导致基准性能的因素之一。成功的另一个关键组成部分一直在设定项目目标和质量,健康,安全和环境(QHSE)问题的目标,这些问题也被经验丰富的项目启动审核审查。审查确定了改进的关键领域,从而促进了项目的成功。基于审查的补救工作计划在短时间内促进了绩效改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利