【24h】

Evaluation of short recovery period investments on utility planning

机译:公用事业规划的短暂恢复期投资评估

获取原文

摘要

Least cost planning for expanding public power systems plays an important role in achieving economic benefits while preserving technological necessities in generation expansion decisions. Many methods of least cost planning have been developed and many computer packages, some of them very sophisticated, have emerged over the years. Investments traditionally follow an integrated development program prepared by a planning agency, usually located in a power utility. The plan identifies the capacityincrements to be added over the planning horizon which, together with the optimal utilization of existing facilities, will meet the demand for power at minimum expected cost.In recent years utility planners have been attempting to attract private developers, often foreign, to participate in power investment. However, the next-best plant as identified by the least cost plan may be unsuitable or unattractive to such developersfor technological reasons, or because the capital requirement is too large or because the normal investment recovery period of such plant is too long to suit private sector investment. Investors may offer unsolicited bids for projects wholly outside theleast cost plan or may offer financial packages with capital recovery period and interest and return on equity rates quite different from the utilities own planning parameters.
机译:扩大公共电力系统的成本最低规划在实现经济效益方面发挥着重要作用,同时保留了一代扩展决策的技术必需品。多年来,已经开发了最低成本规划的许多方法,以及许多计算机包,其中一些非常复杂。投资传统上遵循规划机构编写的综合发展计划,通常位于电力公用事业中。该计划确定要在规划地平线上添加的能力,以及现有设施的最佳利用,将以最低预期成本满足对权力的需求。在近年来的公用事业规划人员一直试图吸引私人开发商,往往是外国的,参加电力投资。然而,由最低成本计划确定的下一个最佳工厂可能对这种开发人员来说可能是不合适或没有吸引力的技术原因,或因为资本要求过大或因为这种植物的正常投资回收期太长而无法适应私营部门投资。投资者可以为完全以外的项目提供未经请求的投标,或者可以提供资本恢复期间的财务计划,并与公用事业计划有关的资本恢复期和利息,并与公用事业的股票返回。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号