首页> 外文会议>IEEE International Electronics Manufacturing Technology Conference >Production challenges of TSOP Copper wire bonding
【24h】

Production challenges of TSOP Copper wire bonding

机译:TSOP铜线键合的生产挑战

获取原文

摘要

With the Copper wire bonding already occupying majority of production lines, there are many significant factors continue to surface out. The Copper wire bonding has also becomes very susceptible to production variability of small leaded packages such as Thin Small Outline Package (TSOP). The TSOP utilizes thin and flimsy leadframes, causing a lot challenges at 2nd bond (stitch). The stitch bonding shows high occurrences of pre-mature failures or wire breaks, while struggling to maintain good stitch bonding strength. Furthermore, the inconsistent stitch bonding can also cause inconsistent tail formation, subsequently affecting the formation of Free Air Ball (FAB) and 1st bond quality. With many DOEs (Design of Experiments), several improvements were executed to address the stitch forming issues. Some of these major actions include optimizing several parameters such as the 2nd bond force, wire looping speed, wire loop mode change and wire sequencing. However, even with the implementation of these improvement actions, the Copper wire bonding performance was only improved by 50%. More comprehensive mapping was extended into possible impact of leadframe location and design. Surprisingly, die attach process was found to be the confounding with the leadframe design. It looks like wire stitch formation at ground lead is not consistent, mostly affected by the die attach epoxy bleed and outgas. In order to obtain more robust Copper wire bonding performance, the die attach process was optimized accordingly. Without losing any die attach quality, optimized process provided much larger operating margin for Copper wire bonding. All the combined improvements managed to eliminate wire break occurrence, while maintaining the good bonding strength of 1st and 2nd bonds. The lessons learnt were very important and already embedded to all new Copper wire bonding projects in order to realize 1st pass success into production mode.
机译:随着已经占据了大部分生产线的铜线键合,存在许多有重大因素的表面。铜线键合也变得非常容易受到小铅封装的制造变异性,例如薄的小轮廓封装(TSOP)。 TSOP利用薄型和脆弱的引线框架,在第二键(针脚)处引起批量挑战。缝合粘接显示出高成熟的预成熟故障或钢丝突破,同时努力保持良好的缝合强度。此外,不一致的缝合键合也可以引起不一致的尾部形成,随后影响自由空气球(Fab)和第一键质量的形成。有许多人(实验设计),执行了几种改进以解决针脚形成问题。这些主要行动中的一些包括优化若干参数,例如第二键粘合力,线环速度,线圈模式变化和线测序。然而,即使使用这些改进作用的实施方式,铜线键合性能也仅提高了50%。更全面的映射延长了引线框架位置和设计的可能影响。令人惊讶的是,发现模具附加过程是引线框架设计的混杂。它看起来像接地铅的钢丝缝线形成不一致,主要受模具的影响环氧流畅和outgas。为了获得更稳健的铜线键合性能,因此相应地优化了管芯附着工艺。在不损失任何模具附加质量,优化的过程提供了更大的铜线粘合操作余量。所有组合的改进都设法消除了焊线破裂,同时保持第一和第二键的良好粘合强度。所学到的经验教训非常重要,已经嵌入了所有新的铜线粘合项目,以实现第一次通过成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号