首页> 外文会议>International Conference on Computational Intelligence Modeling Techniques and Applications >Risk analysis in construction sites using fuzzy reasoning and fuzzy analytic hierarchy process
【24h】

Risk analysis in construction sites using fuzzy reasoning and fuzzy analytic hierarchy process

机译:模糊推理和模糊分析层次工艺建筑工地风险分析

获取原文

摘要

In this paper a risk assessment process is discussed by considering all kinds of body part wise injuries which are commonly occurred in construction sites. The risk corresponding to each body part wise injuries are measured using a combination of fuzzy reasoning and fuzzy-analytic hierarchy process. In the proposed methodology, risk scores corresponding to each body part wise injuries are measured first using fuzzy reasoning. Then associated weights of each body part wise injuries are calculated on the basis of current safety situation using fuzzy-analytic hierarchy process. The overall risk score of the concerned construction sites are evaluated using sum of product method. This risk assessment system is advantageous in dealing with both qualitative and quantitative risk data due to its capability of capturing vague and possibilistic data in an effective and efficient manner and which may help safety professionals and engineers to improve their safety management system of the construction sites. A case study on risk analysis of an Indian construction company is used to illustrate the application potentiality of the proposed approach.
机译:在本文中,通过考虑在施工地点通常发生的各种身体部位危险损伤来讨论风险评估过程。使用模糊推理和模糊分析层次结构的组合测量与每个体部件明智损伤的风险。在所提出的方法中,首先使用模糊推理来测量与每个体部件的风险评分。然后根据使用模糊分析层次处理的当前安全情况计算每个体部件明智损伤的相关重量。使用产品方法的总和评估有关建筑工地的总体风险得分。由于其以有效且有效的方式捕获模糊和可能性数据的能力,这一风险评估系统是有利的,这些系统在处理具有性质和定量风险数据的情况下,这可能有助于安全专业人员和工程师改善其建筑地点的安全管理系统。印度建筑公司风险分析的案例研究用来说明所提出的方法的应用潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号