【24h】

Reclamation of a Tailings Disposal Area in the Canadian Arctic

机译:在加拿大北极地区的尾矿处理区域的回收

获取原文

摘要

Following 26 years of successful mining, the tailings facility at the Nanisivik Mine sitewas reclaimed between 2004 and 2005. The objective of the reclamation plan for thetailings facility was to use the extremely cold environmental conditions to encapsulate thetailings in permafrost, thereby limiting the potential for negative environmental impactsover the long term. This paper provides a summary of the reclamation of the West TwinDisposal Area including the development of the reclamation plan, the construction ofreclamation measures and an update on the performance monitoring undertaken to-date.The paper demonstrates how the effects of global climate change influenced reclamationplanning and how long term reclamation planning undertaken by the mine during miningoperations was critical to the development, and regulatory acceptance, of the finalreclamation plan.
机译:在26年的成功采矿后,尾矿设施在2004年至2005年期间的纳尼维克矿山遗址。第2005年之间的回收计划的目的是使用极其冷的环境条件来封装永久冻土的图案,从而限制了负面的潜力环境影响长期。本文概述了西龙头群地区的填海区,包括开发填海计划的发展,案例措施的建设和关于迄今为止进行的绩效监测的更新。论文展示了全球气候变化的影响影响了回收平方公司的影响矿井期间,矿井期间开垦的填海计划是如何对最终谋杀计划的发展和监管验收至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号