首页> 外文会议>International Astronautical Congress >HTV-X System Integration Plan
【24h】

HTV-X System Integration Plan

机译:HTV-X系统集成计划

获取原文

摘要

Since International Space Station (ISS) operation has been extended up to 2024 and H-2 Transfer Vehicle (HTV) will finish cargo supply service around 2020, a new spacecraft HTV-X, an advanced version of HTV, is being developed. The first HTV-X is planned to be launched in JFY 2021. HTV-X has several major characteristics different from HTV. First, the system design concept is to simplify the module composition. As a result, the module number is reduced from four in HTV to two: Pressurized Module (PM) and Service Module (SM). Also, it has been studied to make the module interface simple by isolating functions of each module to a maximum extent. Second, the exposed and pressurized cargo service capability is improved in terms of cargo mass and reception schedule. Finally, HTV-X can offer an opportunity for on-orbit demonstration mission that can be extended up to 1.5 years at the maximum after departing from ISS. System integration plan is studied to be minimized based on HTV-X system design and HTV experience. This launch site operation duration will be improved to be half of that of HTV.
机译:由于国际空间站(ISS)运营已扩展到2024和H-2转运车辆(HTV),因此在2020年左右完成货物供应服务,正在开发新的航天器HTV-X,先进版本的HTV。第一个HTV-X计划在JFY 2021中启动。HTV-X有几个与HTV不同的主要特征。首先,系统设计概念是简化模块组成。结果,模块号从HTV中的四个减少到两个:加压模块(PM)和服务模块(SM)。此外,已经研究过,通过将每个模块的功能与最大程度隔离,使模块接口简单。其次,在货物质量和接待时间方面,暴露和加压的货物服务能力得到改善。最后,HTV-X可以为轨道示范使命提供机会,可以在ISS出发后最大延长至1.5年。研究了系统集成计划,基于HTV-X系统设计和HTV体验最小化。此发射站点操作持续时间将得到改善为HTV的一半。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号