首页> 外文会议>Global Smart Industry Conference >Estimate Method of Residual Life of Power Plant Equipment
【24h】

Estimate Method of Residual Life of Power Plant Equipment

机译:电厂设备剩余寿命的估计方法

获取原文

摘要

The paper considers a method for improving the maintenance reliability of power-generating equipment. The method is based on monitoring and forecasting a current technical state of the equipment under control and allows determining estimates and forecasting equipment residual life according to the maintenance data in real time. The estimates of residual life of the equipment use composite indices. An on-line algorithm for the recognition of the equipment pre-emergency situation is proposed. The algorithm can forecast possible equipment failures and unforeseen situations. It implicates improving dependability maintenance and remedial maintenance. A method to preemptive scheduling of remedial maintenance is proposed. The method uses composite indices for on-line monitoring and forecasting estimates of residual life of equipment stock The criterion of equipment failures' minimum forms the basis of the scheduling optimization problem. An automated information system for monitoring and real-time forecasting of the energy equipment residual life is proposed. Dropping the unscheduled outages for a turbo-generator with the power 40MW implies the economic benefit of about 8 thousand dollars per diem.
机译:本文考虑了提高发电设备维护可靠性的方法。该方法基于监测和预测控制设备的当前技术状态,并允许实时根据维护数据确定估计和预测设备剩余寿命。设备使用综合指数的剩余寿命的估计。提出了一种识别设备前紧急情况的在线算法。该算法可以预测可能的设备故障和不可预见的情况。它含有提高可靠性维护和补救维护。提出了一种用于抢购修复维护的方法。该方法采用综合指标进行用于在线监测和预测设备剩余寿命的预测估计,设备故障的标准“最小值”的依据构成了调度优化问题的基础。提出了一种用于监测和实时预测能源设备残余寿命的自动化信息系统。滴加出于电力40MW的涡轮发电机的未安排的中断意味着每日约800美元的经济效益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号