This project involves rehabilitating approximately 36,000 LF of abandoned 36- and 30-inch concrete cylinder pipe (CCP) water transmission main with High Density Polyethylene (HDPE) plastic pipe slipliner. The project goal is to rehabilitate the abandoned transmission mains to convey approximately 10.0 mgd of additional renewable potable water resources from the Santa Cruz Well Field. The project is located in mixed-use industrial and rural residential areas of southeast Tucson, Arizona. The 36- and 30-inch CCP transmission mains were installed in the 1960s, and were abandoned due to maintenance issues including corrosion and leakage. Slip lining the abandoned transmission mains with HDPE pipe was selected by the City of Tucson Water Department (Tucson Water) as the most cost-effective and least disruptive technology to develop the requisite conveyance facilities.
机译:该项目涉及使用高密度聚乙烯(HDPE)塑料管衬板修复约36,000 LF的废弃的36英寸和30英寸混凝土圆筒管(CCP)输水主管。该项目的目标是修复废弃的输电干线,以从圣克鲁斯井场输送大约10.0 mgd的额外可再生饮用水资源。该项目位于亚利桑那州图森市东南部的工业和农村混合用途住宅区。 36英寸和30英寸CCP变速箱总管于1960年代安装,由于包括腐蚀和泄漏在内的维护问题而被废弃。图森市水务局(图森水务)选择将废弃的输电干线衬在HDPE管上作为开发必要的运输设施的最具成本效益和最小破坏性的技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号