首页> 外文会议>International Conference on Information and Emerging Technologies >Schedule Slippage, its prevention factors #x00026; their adherence (Assessment of the Project Management Best Practices which contribute in successful completion of projects in the Software Industry of Pakistan)
【24h】

Schedule Slippage, its prevention factors #x00026; their adherence (Assessment of the Project Management Best Practices which contribute in successful completion of projects in the Software Industry of Pakistan)

机译:安排滑点,预防因素及其遵守(评估项目管理最佳实践,以成功完成巴基斯坦软件业项目)

获取原文

摘要

When a project fails to meet its schedule commitments, this is known as slippage. It is well known that software projects typically slip on their schedules. Hence an important aspect of the project manager''s role is to deal effectively with slippage. Although there are different `Best Practices驴 available in prior literature and organizations in local software industry of Pakistan may also be using those. But there is no study, which actually relates these practices with the schedule slippage of the project. This study is based on main factors/practices in all phases of software development that cause delays in project schedule if proper attention is not paid. In this paper we shall observe software development projects in different software organizations to see the schedule slippage, major factors of the slippage and the project management practices followed in those projects. In addition to this we shall evaluate the software projects of local industry against those factors and the practices. It shall give a list of key delay causes that might exist in each phase of project development life cycle about which a software project manager must be aware of, in order to effectively and efficiently complete and deliver a project on time and within budget. This study indicates that the factors, if given proper attention can help in reducing the schedule delays. The results shall also provide the current situation of the schedule delay; our industry is facing which could cause the dissatisfaction of our customers.
机译:当项目未能达到其计划承诺时,这被称为滑点。众所周知,软件项目通常在他们的时间表上滑动。因此,项目经理的作用的一个重要方面是有效处理滑动。虽然有不同的“最佳实践”,但在现有文学中提供的,并且在巴基斯坦当地软件行业的组织中也可能使用那些。但没有研究,实际上将这些做法与项目的时间表滑动相关。本研究基于软件开发阶段的主要因素/实践,如果未支付适当的注意,导致项目时间表的延迟。在本文中,我们将遵守不同软件组织中的软件开发项目,以查看该项目中滑动的主要因素,并在这些项目中遵循项目管理实践。除此之外,我们将根据这些因素和实践评估当地行业的软件项目。它应列出可能存在于项目开发生命周期的每个阶段可能存在的关键延迟原因列表,软件项目经理必须了解哪些软件项目经理,以便有效和有效地完成并在预算范围内完成项目。本研究表明,如果给予适当的关注可以有助于减少日程延迟的因素。结果还应提供日程延迟的现状;我们的行业面临,可能导致客户的不满。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号