首页> 美国卫生研究院文献>other >Dynamic Staffing and Rescheduling in Software Project Management: A Hybrid Approach
【2h】

Dynamic Staffing and Rescheduling in Software Project Management: A Hybrid Approach

机译:软件项目管理中的动态人员配备和调度:一种混合方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Resource allocation could be influenced by various dynamic elements, such as the skills of engineers and the growth of skills, which requires managers to find an effective and efficient tool to support their staffing decision-making processes. Rescheduling happens commonly and frequently during the project execution. Control options have to be made when new resources are added or tasks are changed. In this paper we propose a software project staffing model considering dynamic elements of staff productivity with a Genetic Algorithm (GA) and Hill Climbing (HC) based optimizer. Since a newly generated reschedule dramatically different from the initial schedule could cause an obvious shifting cost increase, our rescheduling strategies consider both efficiency and stability. The results of real world case studies and extensive simulation experiments show that our proposed method is effective and could achieve comparable performance to other heuristic algorithms in most cases.
机译:资源分配可能会受到各种动态因素的影响,例如工程师的技能和技能的增长,这要求管理者找到一种有效且高效的工具来支持其人员配备决策过程。在项目执行期间,重新安排通常会频繁发生。添加新资源或更改任务时,必须具有控制选项。在本文中,我们提出了一个软件项目人员配置模型,其中考虑了基于遗传算法(GA)和爬山(HC)的优化器来考虑员工生产力的动态要素。由于与初始时间表明显不同的新生成的时间表可能会导致明显的转移成本增加,因此我们的时间表策略同时考虑了效率和稳定性。实际案例研究和大量仿真实验的结果表明,我们提出的方法是有效的,并且在大多数情况下可以达到与其他启发式算法相当的性能。

著录项

  • 期刊名称 other
  • 作者

    Yujia Ge; Bin Xu;

  • 作者单位
  • 年(卷),期 -1(11),6
  • 年度 -1
  • 页码 e0157104
  • 总页数 28
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号