首页> 外文会议>International FLINS conference >A NEW PROJECT PLANNING MODEL FOR BETTER HANDLING VAGUENESS AND UNCERTAINTY OF REAL WORLD TASKS WITH AHP AND FUZZY NUMBERS
【24h】

A NEW PROJECT PLANNING MODEL FOR BETTER HANDLING VAGUENESS AND UNCERTAINTY OF REAL WORLD TASKS WITH AHP AND FUZZY NUMBERS

机译:带有AHP和模糊数的现实世界任务更好地处理不确定性和不确定性的新项目计划模型

获取原文

摘要

One of the most important problems of project management is the decision of task durations in the projects. The duration of each task and cumulative durations of the successive tasks generally results in the success or fail of that project. While the common practice is to use natural numbers for task duration, they generally fail to match the real world results. In order to obtain more realistic results, researchers used fuzzy numbers which resulted in an important improvement of estimations but with the vagueness and uncertainty of the business world, they still require improvement. In our study, we used fuzzy numbers with AHP to determine task durations and adapt them to real world, first we separately find the levels of vagueness and uncertainty of tasks using AHP and then we use these categories to manipulate our fuzzy membership function for better prediction of tasks' durations and certainty levels so we can provide a more accurate project plan with more realistic task durations.
机译:项目管理中最重要的问题之一是项目任务期限的确定。每个任务的持续时间和后续任务的累积持续时间通常会导致该项目的成功或失败。尽管通常的做法是使用自然数作为任务持续时间,但它们通常无法与实际结果相匹配。为了获得更现实的结果,研究人员使用了模糊数,这使估计值得到了重要的改进,但是由于商业世界的模糊性和不确定性,他们仍然需要改进。在我们的研究中,我们将模糊数与AHP结合使用来确定任务持续时间并使它们适应现实世界,首先我们使用AHP分别找到任务的模糊性和不确定性水平,然后使用这些类别来操纵模糊隶属度函数以进行更好的预测任务持续时间和确定性级别,因此我们可以提供更准确的项目计划和更现实的任务持续时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号