首页> 外文会议>International symposium on progress in safety science and technology;2010 ISSST >Simulation and Prediction of Mine Inflow:a Case Study of Shihao Coal Mine of Henan Yima Coal Group
【24h】

Simulation and Prediction of Mine Inflow:a Case Study of Shihao Coal Mine of Henan Yima Coal Group

机译:矿山涌入量的模拟与预测-以河南义马煤业集团石豪煤矿为例

获取原文

摘要

The calamities caused by mine water had brought about enormous economic losses and casualties, predicting the mine inflow has been the scientific basis for the management of damage caused by mine water. In this paper, we took Shi Hao coal mine in Henan province as an example, predicted the mine inflow by means of numerical simulation and found that if the mining level reached +100m the mine inflow would be 445.08m3/h.To ensure the safety of coal production, we should make the water discharge to this value or larger than it when designing the drainage of the mine.
机译:矿井水造成的灾难造成了巨大的经济损失和人员伤亡,预言矿井的涌入已成为处理矿井水造成的损害的科学依据。本文以河南省石Ha煤矿为例,通过数值模拟预测了煤矿入矿量,发现如果开采水平达到+ 100m,则矿井入水量为445.08m3 / h。煤炭生产时,在设计矿井排水系统时,应使排水量等于或大于此值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号