首页> 外文会议>International conference on urban transport and the environment >Model of connecting an airport by rail -case study: the city of Zagreb
【24h】

Model of connecting an airport by rail -case study: the city of Zagreb

机译:通过轨道连接机场的模型 - CASE学习:萨格勒布市

获取原文

摘要

Zagreb Airport is a distance of 15km away from the City of Zagreb itself. It is connected with the City by road, which is congested during the morning and afternoon peak hours of commuting transport, thus significantly affecting the travel time to and from the airport. The airport development plan for the next 20 years includes the construction of another runway and a new passenger terminal of higher capacity for passenger handling and an adequate level of equipment. Regarding the planned increase in traffic at Zagreb Airport, it is necessary to expand the infrastructure capacities that connect the centre of Zagreb and Zagreb Airport, since already the existing capacities are insufficient. The current connection of the airport with the city is exclusively by road; more precisely, the main road that connects the city of Velika Gorica with Zagreb, and which is one of the busiest roads in the Republic of Croatia, and already as such cannot meet Zagreb Airport's requirements. Since the railway line that connects the cities of Zagreb and Velika Gorica passes within the vicinity of the airport, the plan is to connect Zagreb Airport to the existing railway infrastructure and to construct an underground stop under the passenger terminal. This paper does not focus on the infrastructural solutions, but rather on the operator model, i.e. a rail carrier that would provide adequate transport of passengers in relation to Zagreb-Zagreb Airport-Velika Gorica. The paper will analyze the current state regarding the number of passengers and the methods of arriving, i.e. leaving the airport. Regarding the expected number of passengers in the future and the construction of an underground railway stop, a railway carrier model will be provided. The model will encompass the dimensions of the mobile capacities, i.e. transport means, the rail carrier trip frequency (headways), and the introduction of an integrated transport document for the purpose of more comfortable travel.
机译:萨格勒布机场距离萨格勒布本身距离酒店有15公里。它与城市与城市相连,在早上和下午升级的近期运输的下午峰值时间内拥挤,从而显着影响到机场和来自机场的旅行时间。接下来的20年的机场发展计划包括建造另一个跑道和新的乘客搬运能力的乘客终端以及适当的设备水平。关于萨格勒布机场的交通计划增加,有必要扩大连接萨格勒布和萨格勒布机场中心的基础设施,因为现有的现有能力不足。目前机场与城市的连接仅乘坐公路;更确切地说,主要的道路与萨格勒布连接着Velika Gorica城市,这是克罗地亚共和国最繁忙的道路之一,并且已经这样也不能满足萨格勒布机场的要求。自连接到机场附近的Zagreb和Velika Gorica通行证的铁路线以来,该计划是将萨格勒布机场连接到现有的铁路基础设施,在客运站下建造地下停留。本文不关注基础设施解决方案,而是在运营商模型上,即将提供与Zagreb-Zagreb Airport-Velika Gorica相关的乘客的充分运输。本文将分析当前国家,了解乘客数量及到达方法,即离开机场。关于未来的预期乘客数量以及地下铁路停止的建造,将提供铁路运营商模型。该模型将包括移动容量的尺寸,即运输方式,轨道运输跳闸频率(头部),以及用于更舒适的旅行目的的综合运输文件的引入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号