EXPERIENCES OF RISK/COST/SCHEDULE/ TEST EFFECTIVENESS EVALUATIONS IN THE MAT€D OPERATIONAL PHASE

机译:运营阶段的风险/成本/时间表/测试效率评估的经验

获取原文

摘要

After three years of work, carried-out within a couple of European Space Agency (ESA) studies, the Model and Test Effectiveness Database (MAT€D) initiative entered in its operational phase. MAT€D represents a common repository of project data, Assembly Integration and Verification (AIV) data, on-ground and flight anomalies data, and offers, with the application of suitable methodologies, the possibility to analyze the collected data in order to improve the test philosophies and the related standards. The paper after a short presentation of the status of the MAT€D initiative and its technical characteristics, summarizes the most recent lessons learned resulting from the data analysis and highlights on how MAT€D is being utilized for the actual risk/cost/schedule/test effectiveness evaluation of the past programmes so as for the prediction of the new space projects.
机译:经过三年的工作,在欧洲航天局(ESA)的几次研究中进行了研究,模型和测试有效性数据库(MAT€D)计划进入了运营阶段。 MAT€D代表项目数据,装配体集成和验证(AIV)数据,地面和飞行异常数据的通用存储库,并通过应用适当的方法论,提供了分析收集到的数据以改善质量的可能性。测试哲学和相关标准。在简短介绍MAT€D计划的状态及其技术特征之后,该论文总结了从数据分析中学到的最新经验教训,并重点介绍了如何将MAT€D用于实际风险/成本/计划/测试过去计划的效果评估,以便预测新的太空项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号