首页> 外文会议> >Modeling of Well Productivity In Perforated Completions
【24h】

Modeling of Well Productivity In Perforated Completions

机译:射孔完井井产能建模

获取原文

摘要

Well productivity is the major factor which determines the economic outcome of a well. It depends on the degree of communication between the welbore and the producing formation. Most oil and gas wells in the petroleum industry today are completed with a steel casing and cement to control the water influx and production from different zones. In these wells communication with the formation is re-established through perforations, usually created by firing shaped charges. The productivity of the resulting completion depends on design variables like shot density, penetration depth and phasing angle.
机译:油井生产率是决定油井经济结果的主要因素。它取决于韦尔博雷岩层与生产地层之间的连通程度。如今,石油工业中的大多数油气井都装有钢套管和水泥,以控制不同地区的水流入和生产。在这些井中,通常通过发射定型炸药形成的射孔来重建与地层的连通。最终完井的生产率取决于设计变量,例如喷丸密度,穿透深度和相位角。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号