【24h】

LET REVISE THE ASTM METHOD F.459 FOR WIREBONDING PROCESS CONTROL

机译:让我们修改ASTM F.459方法来进行绕线过程控制

获取原文
获取原文并翻译 | 示例

摘要

Wire pull testing cannot be used to monitor wirebonding process control as the X-bar and R charts of raw pull strength data routinely demonstrate wide variations. The bonding process appears to be out-of-control, indeed the testing methodology and data collection itself are inaccurate in representing the process. Many factors, which are difficult to control in production, can subtly affect the raw data SPC. The author will review the pull test method to identify the potential variation (s), that causes the errors and are misleading in the process control. The paper also includes the efforts to revise the ASTM's method F. 459 for its Pull Test in making the data collected using this method applicable in the statistic process control (SPC) chart.
机译:导线拉力测试不能用来监视引线键合过程的控制,因为原始拉力强度数据的X线图和R图通常显示出很大的差异。绑定过程似乎无法控制,实际上,测试方法和数据收集本身在表示该过程方面是不准确的。许多在生产中难以控制的因素会微妙地影响原始数据SPC。作者将审查拉力测试方法,以识别可能引起误差并在过程控制中产生误导的潜在变化。本文还包括努力修改ASTM的拉力测试方法F.459,以使使用此方法收集的数据适用于统计过程控制(SPC)图表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号