首页> 外国专利> Rubble mound construction system and construction of rubble mound

Rubble mound construction system and construction of rubble mound

机译:瓦砾土墩施工系统和瓦砾土墩施工

摘要

PROBLEM TO BE SOLVED: To prevent a situation in which the construction of a rubble mound is delayed or the construction cost increases. SOLUTION: A polluted water diffusion prevention fence surrounding the periphery of an opening is suspended and attached to a rubble drop pontoon provided with an opening for dropping rubble thrown from above the sea to the seabed. The gut ship throws the loaded rubble into the opening of the rubble drop pontoon from above the sea with a heavy machine, and builds a rubble mound on the seabed. The heavy machinery installed on the gut ship throws rubble into the opening of the rubble drop pontoon without the gut ship coming alongside the rubble drop pontoon. [Selection diagram] Fig. 6
机译:要解决的问题:防止瓦砾土墩的建造的情况延迟或施工成本增加。 解决方案:围绕开口周边的污染水扩散防护围栏被悬挂并附接到具有用于从海面上方抛出海底的瓦砾扔进瓦砾的瓦砾下落浮桥。 盖齿船用沉重的机器将装载的瓦砾扔进瓦砾落水的开口,并在海底上建造瓦砾土墩。 装有齿轮船上的重型机械将瓦砾扔进瓦砾浮桥的开口,没有锯齿船一起落后的碎石浮桥。 [选择图]图6

著录项

  • 公开/公告号JP6978798B2

    专利类型

  • 公开/公告日2021-12-08

    原文格式PDF

  • 申请/专利权人 有限会社善徳丸建設;

    申请/专利号JP20200062372

  • 发明设计人 野田 昌幸;

    申请日2020-03-31

  • 分类号E02D15/10;

  • 国家 JP

  • 入库时间 2022-08-24 22:40:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号