Problem to be solved: to delay the construction work of construction of the rubble mound and to increase the construction cost.Solution: a waste water spreading prevention fence surrounding the opening is suspended by mounting a rubble thrown from the sea side to an abandoned pellet throwing boat provided with an opening to be thrown on the seabed.The gut ship is placed on the open side of the trash stone boat by heavy machinery from the sea side, and the rubble mound is constructed on the sea bottom.It is carried out with the heavy equipment provided in the gut boat to carry the crushed stone to the opening of the crushed throwing vessel, and the gut boat is not attached to the pellet dropping boat.Diagram