首页> 外国专利> Rubble mound construction system and construction of rubble mound

Rubble mound construction system and construction of rubble mound

机译:瓦砾土墩施工系统和瓦砾土墩施工

摘要

Problem to be solved: to delay the construction work of construction of the rubble mound and to increase the construction cost.Solution: a waste water spreading prevention fence surrounding the opening is suspended by mounting a rubble thrown from the sea side to an abandoned pellet throwing boat provided with an opening to be thrown on the seabed.The gut ship is placed on the open side of the trash stone boat by heavy machinery from the sea side, and the rubble mound is constructed on the sea bottom.It is carried out with the heavy equipment provided in the gut boat to carry the crushed stone to the opening of the crushed throwing vessel, and the gut boat is not attached to the pellet dropping boat.Diagram
机译:要解决的问题:延迟瓦砾土墩建设的建设工作,提高施工成本。解决方案:围绕开口的废水蔓延防护围栏,通过将瓦砾从海边抛出到废弃的颗粒投掷时悬挂 船只设有一个开口的开口被扔在海床上。通过海边的重型机械放置在垃圾石船的开放侧,瓦砾土堆在海底上构造。它是用的 在齿轮船中提供的重型设备将压碎的石头携带到破碎的投掷容器的开口,并且齿槽未连接到颗粒滴船。侏锐

著录项

  • 公开/公告号JP2021161673A

    专利类型

  • 公开/公告日2021-10-11

    原文格式PDF

  • 申请/专利权人 有限会社善徳丸建設;

    申请/专利号JP20200062372

  • 发明设计人 野田 昌幸;

    申请日2020-03-31

  • 分类号E02D15/10;

  • 国家 JP

  • 入库时间 2022-08-24 21:35:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号