首页> 外国专利> Application ramp rate control in large installations

Application ramp rate control in large installations

机译:大型安装中的应用斜率控制

摘要

To eliminate the adverse effects of power swings in a large scale computing system during the life cycle of an application or job, control of several operating characteristics for the collective group of processors is provided. By providing certain levels of coordination for the many processors utilized in large scale computing systems, significant and abrupt changes in power needs can be avoided. In certain circumstances, this may involve limiting the transition between several C-States of the processors involved and the overall power transitions for a large scale system are not detrimental and do not create issues for the data center or local power utility. Some cases will require stepped transitions between C-States, while other cases will include both stepped and modulated transitions. Other cases will incorporate random wait times at the various transitions in order to spread the power consumption involved. In yet further circumstances the C-States can be pinned to a specific setting, thus avoiding transitions caused by C-State transitions. To deal with further issues, the processor P-States can also be overridden.
机译:为了在应用程序或作业的生命周期期间消除功率摇摆在大型计算系统中的不利影响,提供了对集体处理器组的若干操作特性的控制。通过为在大型计算系统中使用的许多处理器提供某些程度的协调,可以避免功率所需的显着且突然的变化。在某些情况下,这可能涉及限制涉及的处理器的几个C状态之间的转换,并且大规模系统的整体功率转换并不有害,并且不会为数据中心或本地电力实用程序创建问题。某些情况将需要C状态之间的阶梯转换,而其他情况将包括阶梯式和调制转换。其他病例将在各种转换中包含随机等待时间,以便传播所涉及的功耗。在进一步的情况下,C状态可以固定到特定设置,从而避免由C状态转换引起的转换。要处理进一步的问题,还可以覆盖处理器p状态。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号